New Refrigeration Equipment

Client: Pharmaceutical Manufacturer - Oxford

The chiller units for the existing facility were no longer compliant with current regulations and costly in terms of energy usage. The objectives were to: –

1 – Prepare scope documents for an modern chilling system to enable a vendor to bid for a suitable replacement system.

2 – Issue documents, carry out a bid tender analysis of bids received and recommend a vendor.

3 – Act as client project manager to ensure the project was executed successfully including preparing a suitable contract carrying out a technical review of the final design and monitoring the installation from a quality prospective.

 

 

 

 

 

 

 

Scope

  • Heat balances
  • System Rationalisation
  • Load Specification
  • Refrigeration Equipment Specification
  • Thermal Buffer options
  • Control Systems
  • Project Management
  • Capital Cost Estimating
  • Principal Designer Role and Site Safety