• Consultancy Services to Support a Third Party Hydrogenator Design
• Area Classification of a new £25 m Pharmaceutical Plant (to IEC 61508)
• Validation Services for a New DCS system
• Design Verification of a USP Water generation plant and distribution network
• Design and Commission a £1m Commercial Scale Chromatography Plant
• Conversion of a Batch Solvent Solution Make Up Plant to Continuous
• Detailed Design of a DCS Expansion Project
• Software Configuration for a DCS Batch Process Expansion
• Provision of DCS Configuration Commissioning Support
• Design of Mock Up House Fire Training Simulator including Process Control and Piping
• Design of Mock Up Aircraft Fire Training Simulator including Process Control and Piping
• Ergonomic Upgrade of a 50L Pharmaceutical Pilot Plant
• FED for a Pharmaceutical Pilot Plant Modernisation
• Process Instrument and Control Detailed Design for a Pharmaceutical Plant Expansion
(Including DCS control, Shutdown systems, DIERS relief systems, USP water system expansion)
• Design, and Project Management of a Pharmaceutical Pilot Plant Modernisation
• Provision of Validation Services for a 50L Pharmaceutical Pilot Plan Upgrade
• FED & Detailed Design for a multi-purpose pharmaceutical milling system incudling a CIP package
• Feasibility Study – Pilot Plant Dryer Discharge Containment Improvement
• Detailed Design and Validation of a Mobile Milling System
• FED for an Adhesives Plant Expansion
• FED for a new two reactor Hydrogenation Facility
• Detailed Design and Validation of a Centrifuge Dryer
• Detailed Design of an Ultra Filtration Plant
• Agitation Upgrade for a 12 Reactor Unit
• Flammable Gas Vent Discharge Systems
• Design of a 3 Reactor Train Hydrogen Emergency Vent System
• Validation of a Centrifuge / Dryer Facility
• Development of a Simplified ‘One Protocol’ Validation Procedure
• Design of a CIP System for a OEL 4 Isolator
• Installation of a Tablet Coater
• Market Survey – Capsule Fillers
• Review of a Plants Emergency Venting System (DIERS)
• Concept re Design of a Plants Emergency Vent System for 2 Phase Flow
• Design of a Inerting System for a Centrifuge
• Development, Installation and Validation of a Portable PAT System
• Installation and Validation of a Semi-Portable PAT System
• Design and Installation of a Tablet Coater
• Re-Assessment of a COMAH sites Hazardous Area Classification
|
 |